A mixed-use development bringing retail, medical and administrative activity together in a prime location opposite the French University in Shorouk City — already built and in operation, developed and managed by Z Group.
Strategic Location
A mixed-use development bringing retail, medical and administrative activity together in a prime location opposite the French University in Shorouk City — already built and in operation, developed and managed by Z Group.
Project Overview
Orium Mall is a mixed-use development created by Z Group in Shorouk City, combining commercial, medical and administrative activity within a single integrated building. It was conceived to answer a growing city's need for a hub that spares residents and their surroundings the daily commute between shopping, healthcare and business. Today, Orium fulfils that role as an operating destination, home to active tenants and a steady flow of visitors.
Project Concept
Orium was designed around the integration of three uses, each occupying its own level: the ground and first floors for commercial activity — shops, restaurants and services; the second floor for clinics and medical services; and the third floor for offices and administrative activity. This vertical distribution gives every activity the environment and privacy it needs, while all uses share the same visitor movement; a single visit may combine a medical appointment, shopping and an administrative errand — enhancing both the visitor experience and the flow of operation across the project.
Project Features
Operation & Brands
Orium Mall is already up and running, driven by established activities that give it its daily rhythm. The two commercial floors host a mix of restaurants, cafés, shops and services — among them brands such as Pizza Hut and Bazooka — while the medical and administrative floors welcome their visitors and business owners. The value of this live operation lies in what it offers anyone considering a presence within the project: a working environment and an existing customer flow, rather than spaces still waiting to open.





Spacious garages
24/7 Security and guarding
Modern CCTV surveillance
Elevators and escalators
Continuous maintenance and operation services
Professional facility management
Comfortable waiting areas
Integrated cleaning services
Open central plaza





Orium Mall occupies a central position in the heart of Shorouk City, directly opposite the French University and next to an international school. This places the project along a continuous daily path of students, professionals and resident families, turning that constant presence into a genuine flow of visitors. In turn, it gives the commercial, medical and administrative units within the project a stable customer base that supports their continuity and success.